Check the correction and the draft separately
Mira originally recorded 75 minutes on testing and 45 minutes on a separate checkout task. At the project rate of $120 an hour, that is $240. Jo recorded 120 minutes at the agreed member rate of $150 an hour, which adds $300. The original draft time subtotal is $540. Another 30 minutes of internal coordination stay in the timesheet with their own billing classification.
The accepted change reduces the test entry to 60 minutes. Open the entry history to see who made the change and why. Refresh the draft to include the correction. Mira now has 105 minutes at $120 an hour, or $210, and Jo's $300 stays in the draft. Review the resulting $510 subtotal against the approved source records before issuing.
Review warnings before you issue
Colabio's client invoice workflow shows outstanding review questions, correction requests and pending manual time in the issue flow when they apply to the draft. An authorized reviewer can settle them first or acknowledge the open items. A stale draft needs to be refreshed. In this exercise, the team settles the correction and checks the changed line before issuing.
In the application, drafts can follow the timesheet when refreshed and issued invoices keep their numbered lines and totals. Use the product's documented process to review any correction that arrives after issuing. The example above runs entirely with fictional records.
Give finance a short record to check
Record the client period, the affected member and project, the original and accepted minutes, who reviewed the change and which draft was refreshed. Use the billing evidence checklist to check rates and client-facing wording. The timesheet to invoice calculator lets you run the arithmetic on your own reviewed hours.
Book a Colabio demo to see how your delivery and billing owners could use the review, draft and issue steps on a sample project.