Current time per week
13 h 30 min
$1,012.50
Proposed time per week
4 h 36 min
3 h live + 1 h 36 min written
$345.00
Change over 4 weeks
35 h 36 min freed
$2,670.00 lower estimated cost

Weekly change is 8 h 54 min freed and $667.50 lower estimated cost.

How to calculate the cost of a recurring meeting

Multiply the number of attendees by the minutes per meeting and meetings per week. Divide the person-minutes by 60 to get person-hours. Multiply the hours by an estimated cost per person-hour if there is a rate for the group. Run separate scenarios when the attendees or rates change across meetings.

For the proposed plan, count the time to read and write updates as well as the remaining live minutes. Include the time the same participants would spend preparing the decision in each plan. Start with the remote team meeting load audit if attendee counts, schedules or overlapping events need to be checked first.

A six-person planning example

Three 45-minute meetings use 13 hours and 30 minutes of team time each week. Suppose the team keeps one 30-minute discussion and adds two written updates that take eight minutes per person each. The proposal uses 4 hours and 36 minutes of team time. The weekly difference is 8 hours and 54 minutes.

At an illustrative $75 per person-hour, the current schedule costs an estimated $1,012.50 per week and the proposal costs $345. That is $667.50 less per week, or $2,670 over four weeks. The estimate represents the cost of team time. Use the same rate basis for both plans and verify actual costs and capacity independently.

Compare the decisions each schedule supports

Give the new schedule a named owner and the same decision deadline. After several occurrences, ask whether the written updates were read and whether the remaining call was long enough. Use the working-hours overlap calculator to check whether the proposed live time works in both regions.

Colabio shows scheduled meeting load beside tracked work. This calculator uses the amounts entered here. Book a Colabio demo to see how calendar load and team updates can support a real weekly review.