Time tracking software evaluation scorecard

Give each shortlisted tool the same six checks. Ask a team member, reviewer and billing owner to run their part with the same fictional entries. Keep the result and evidence for your buying decision.

Start with the sample timesheet records and the reconciliation workbook. Use a trial workspace and review the same dates, project roles and rates. Reset the fictional data to its original review state before checking the expected export total.

Time tracking pilot scorecard

0 passed0 marked for follow-up6 untested
  1. Record and switch tasks

    Team member

    Track a short task, switch to another project, then find both entries on your own timesheet.

    Two records with the intended project, task, minutes and dates.

  2. Correct a reviewed entry

    Member and reviewer

    Use the sample TS-103 late stop. Shorten 75 minutes to 60 and record who made the change.

    The affected entry, original duration, reviewed duration and reason.

  3. Handle an open manual request

    Reviewer

    Use TS-105. Check the 45-minute request while it awaits a decision and again after review.

    The open request stays visible. Confirm when the reviewed amount changes.

  4. Verify what each person can see

    Manager and member

    Check collection settings and open the intended project page as a member from a different project.

    A record of the enabled settings and the actual project access seen by each role.

  5. Reconcile the reviewed export

    Operations

    Compare original and reviewed minutes and trace the midnight entry TS-108 through the exported date range.

    The agreed period, time-zone basis and reviewed 310-minute total for the sample.

  6. Check the client billing handoff

    Billing owner

    Recreate the sample's two client subtotals on the billing path your team would use.

    $450 for Lantern and $50 for Maple. Trace each amount to its reviewed time and rate.

Your entries stay in this page. Download the CSV to keep the results before closing or clearing it.

Use the same evidence in each trial

Agree which results your team needs before the demo. Start a timer with the device a member will use. Then ask a reviewer to follow an original entry through a correction and export. The migration checklist gives a way to record the import, reporting period and the first pass through an actual work pattern.

Mark a case untested when the right role, device or plan is unavailable. A needs-work result should name the missing step. For example, a report can display 310 minutes while leaving out the reason for a 15-minute correction. Save the changed entry and exported file names and confirm whether that evidence meets your team's needs.

Bring the scorecard into the decision

Download one scorecard per trial. Read the unresolved cases with the owner who would receive the output. Decide which open items need another test and who can run it using the same inputs. For a starting shortlist, browse the side-by-side alternatives and comparisons.

Use the observed review effort in the time tracking ROI calculator to compare the cost and onboarding effort of a longer trial.

Book a Colabio demo to run the cases that matter for your team with an example project and timesheet.