Use the workbook history that answers your question
Microsoft's Show Changes help describes seeing who edited a cell, when, and the prior value where available. Check the workbook with the actual Excel versions and collaboration setup your team uses. The Show Changes troubleshooting guide explains gaps, including older clients and changed workbook copies.
For files stored in Microsoft 365 OneDrive or SharePoint, Microsoft documents opening previous workbook versions. Open the relevant version for inspection. Keep it with the period and use the stable entry ID to locate the same record in the current sheet. A row number can change when the team sorts it.
Write down the time period on the workbook and the source time zone. If reviewers work from separate exports, associate each export with a revision date and owner. The next person should be able to identify the exact file finance received without guessing which saved copy was current.
If the team wants a record for months after the usual collaboration window, agree which copies and review notes belong in its archive. A workbook restored for investigation can be saved separately for comparison. Keep the original period and visibility controls with any copied file.
On a shared sheet, have the reviewer open the same entry after another person changes a project name or sorts rows. The ID should still find the same historical time. If the source export supplies dates and offsets, keep those columns intact with the first version.
Review a 15-minute correction from source to draft
| Record | What it shows | What the reviewer checks |
|---|---|---|
| Original export | 75 minutes on QA notes | Entry ID, client, project and reported interval. |
| Workbook change | Reviewed duration updated to 60 minutes | Prior value and editor where the workbook history exposes them. |
| Review decision | Late stop removed after checking actual end | Reason, approved change, reviewer and date. |
| Finance draft | $30 difference at $120 per hour | Client, period, applicable rate and the version used. |
Download the reconciliation workbook and find TS-103 in the original and reviewed tabs. Compare the original 75 minutes with the approved 60. If this is the only change and the time is billable at $120, the line is $30 lower. Check whether any other entry or rate changed before applying the result to a client draft.
Record the reason and decision beside the reviewed row or in a separate review record keyed to its ID. Ask another person to filter for TS-103, locate the original version and tell you why the total changed. If one of those steps fails, record what evidence is still missing before treating the review as complete.
Try a second correction that changes the client or billable classification while keeping duration. Compare both the reviewed time total and who pays for the row. A copied number alone will miss that decision. Document the previous and revised classification beside the same ID.
If the allowed invoice draft has already been sent, hand off the original and reviewed versions to its billing owner. Share the entry and approved reason with the person who owns the accounting decision. The post-issue correction guide walks through a worked example.
Choose the time review path that preserves the decision
Entry ID, member, client and dates:
Original value and workbook or time entry:
Reviewed value, reason and authorized reviewer:
Billing treatment and draft before or after:
Version exported to finance and when it was sent:Colabio keeps edit history and approval decisions on time records. Reviewers can find the original and the changed entry before exporting time or refreshing a draft. Book a Colabio demo to run the same 15-minute correction and check where the evidence appears for each role.