How to switch from DeskTime to Colabio and keep the time history

Archive the DeskTime records your reviewers still need. Build a small Colabio project and confirm how each member starts, stops and reviews task time. Compare a final DeskTime period with the first Colabio period using agreed reporting definitions.

By the Colabio teamPublished 4 min read

Key takeaways

  • Export the DeskTime records used for reporting while the right staff still have access.
  • Document what each time field measures and choose one start point for the new tracker.
  • Pilot Colabio's task timer, role access and one approved correction before the team switches.

Archive the DeskTime reports your team uses

Write down which exports your team actually needs. The DeskTime Exports guide describes choosing a report, period, teams and members, then downloading CSV or Excel. Save the export version, date range, people and time zone with the file. Keep access limited to the people who need this history.

Read the field names before comparing reports. DeskTime's getting-started documentation distinguishes DeskTime time, time at work and projects time. Its Reports guide says which time zone the report uses. Record the definition of each saved metric and ask the report owner which one downstream billing or operations reads.

Retain open manual time decisions in the migration handoff. DeskTime documents manually added offline time and its approval setting. Write down any remaining approver, original date and source record. Close or hand off each case according to the team's chosen cutoff.

Map one real-shaped week before moving the team

Recorded workMinutesDecision before the pilot
Assigned project work390Map the known client and project to tasks with an owner.
Reviewed off-device work50Check the manual work record and confirm its task and treatment.
Entries needing clarification25Keep the original references and give each a reviewer.
Fictional example for one person. The three rows are distinct parts of the same source record.

In this example 440 of 465 minutes have a reviewed work assignment, with 25 minutes still open. Keep project, customer and time categories visible. The archived export is evidence of historical work. Agree whether later reports will reference that archive or use a separately tested migration, along with the source and method.

Set up one project in Colabio, invite the appropriate pilot roles and test the dashboard web timer or the desktop app members will use. Verify task access, capture settings and the before-and-after correction record. Ask a member to show where a task switch and the subsequent correction appear.

Check the cutover on both devices in the pilot. For example, end the first system at Sunday 23:59 local and use the new process from Monday 00:00. If someone was working across the boundary, review the actual interval and write down which side carries each part. Check an offline device has had time to sync before finalizing the archive.

Choose a week with both ordinary timer sessions and manual work. Have the source owner generate the export and the receiving reviewer reproduce the totals from an approved copy. If an export groups work by team while finance needs a member or client view, preserve the grouped export and document the alternate report you use.

When a source project was renamed, put both names in the mapping and check the dates where the name changed. If two clients used the same label, use the source identifier or the known client relationship to resolve it. Save an unresolved mapping with an owner rather than guessing where those historic minutes belong.

Assign a person to check duplicate use after cutover. They should review any record that might have reached both tools, and save the reason for the reporting-period treatment. Test the workflow with the fictional records before changing the archive arrangement.

Keep the first cutoff and review record

DeskTime cutover record
Source export, covered period and date basis:
Last period in DeskTime and first period in Colabio:
Project and task mapping owner:
Pending correction and reviewer:
First Colabio export and comparable totals:
Stop or proceed decision for the next team:

Use the time tracking migration checklist to run the same pilot for another team. Ask a second reviewer to recreate the account totals from the archived source and the new records. Book a Colabio demo to walk through the cutover with a fictional project and its reviewer.

Try it with your team

Colabio is free for individuals. Team plans are billed per seat and start with a free trial.

The Colabio team uses AI assistance to prepare guides. Worked examples use fictional data unless a source identifies them as real.