Make the submission usable by another person
- Ask the contractor for the period, project and task references, entries with duration and a short description of what moved forward.
- Name the person who can check that work, one backup reviewer and the deadline with a time zone.
- Include any manual time or change from the original record with the reason. Keep questions about scope or the agreed rate in their own fields.
- Provide a way to request a correction before the record goes to finance.
Keep the review decision beside the original entry
| Entry | Review | Result |
|---|---|---|
| 14 h client implementation | Lead matches task and delivery records | Ready for the reviewed total |
| 2 h QA assigned to the wrong client task | Contractor explains the assignment. Authorized reviewer approves a move with its reason. | Ready after approved correction |
| 2 h labeled onboarding | Reviewer checks whether the existing engagement includes it | Open question for the agreement owner |
The lead can reconcile 16 hours and show two unresolved hours separately. Use the contractual process to decide whether to close the batch or wait. Preserve the entry and the question even if the current export leaves it out. Apply the same rule if a corrected row changes client billability.
Copy the approval and handoff record
Contractor, project, period and time zone:
Source submission and timestamp:
Reviewer and review date:
Reviewed hours by task or project:
Corrected entries, previous values and reason:
Open entries, owner and decide-by date:
Agreed billing basis or finance reference:
Export version, recipient and close status:Use one export version as the handoff record. When a late change arrives, refer to that version and explain which approved value changes. Use the distributed timesheet cutoff guide if members submit from different zones.
Decide who handles common exceptions
| Exception | What to record | Who can resolve it |
|---|---|---|
| Description does not explain the entry | Record the specific question with the task and time window. | The contractor supplies context and the designated reviewer checks it. |
| Two timers overlap on the same person | Keep both original entries and compare the source intervals. | The contractor explains the overlap and the authorized reviewer approves any change. |
| Contractor worked under a different rate | Record the agreed work category, effective date and current rate source. | The agreement owner resolves the rate. Finance applies the approved rate to reviewed time. |
| A correction comes after close | Reference the existing export and the affected row. Record the proposed changed total. | The close owner and finance agree which later record will carry the adjustment. |
Before the pilot, ask every role what they would do with the same issue. If one person would delete a row and another would quietly export around it, agree on one review step. For project leads who share a contractor, give each lead the entries for their own project and name an owner for any between-project move.
In the 18-hour example, six weeks later a finance reviewer should be able to recover the submitted total, the 16 hours that reconciled, the reason for the QA correction and the owner of the remaining two hours. Include this reconstructability check in the pilot before using the export workflow for a real payment decision.
Test the reviewer and member views together
In Colabio, members can ask for permitted time corrections and clarification. Access depends on the manager or project reviewer’s scope. Check a fictional correction from the member’s view and the reviewer’s view, then reconcile the updated entry against the handoff record. A time review is a distinct step from issuing an invoice or paying a contractor.
If several project leads approve time for finance, book a Colabio demo to test the role boundaries and review flow with your setup.