How to scale an agency to a second delivery team

An agency can take on more work when a second team can own delivery and the first team's leads can still keep their commitments. Check review capacity, project access and the first billing handoff before adding a new client stream.

By the Colabio teamPublished 4 min read

Key takeaways

  • Check capacity by role. Include the people who review, onboard and approve work.
  • Give the second team an owner, project and approved source of client information.
  • Run one delivery and billing period before expanding the next engagement.

Check the capacity of the role that must approve work

RoleAvailable timeWork already planned or proposed
Shared delivery lead25 hours for client work and review15 h delivery, 6 h first-team reviews, 4 h onboarding and 3 h new-team review.
New delivery team64 team hours52 h of work with 12 h still unallocated.
Client account ownerOne agreed weekly decision windowConfirm scope, report recipients and first billing review.
Fictional first-week commitments for an agency adding a second team

The lead has 28 hours of planned work and 25 available, a three-hour shortfall. The new team's 12 unallocated hours are useful only if a qualified member can take one of the lead's decisions. If a second reviewer can own all three new review hours, the lead reaches 25. If no reviewer is ready, reduce the launch scope or move the start date.

Use the team capacity calculator to check each group with the same dates. Ask the leads which existing commitments can move and which need their specific approval. Write down a backup for any review required when the original lead is on leave or outside working hours.

Try a sick-day scenario before launch. If the original lead loses four hours of available time, moving three hours of review frees the earlier shortfall and the revised plan still exceeds capacity by four. Agree which customer deliverable can move and when the account owner will confirm the revised plan.

Name one person who can prepare a review but needs a lead to approve it. A written checklist can reduce the lead's preparation time. Put the approval deadline and what needs to be checked in the task. Record any actual changes to responsibilities in the pilot, including the time each person needs.

Give the new team an independent workflow

Put the new client work in its own project with assigned tasks. Confirm which person can see or review the time on it. Colabio's roles and permissions explains the organization and project roles and who can decide corrections. Check the actual member and reviewer views in a sample project before granting appropriate access.

Run the project and permissions check with a sample member assigned only to the new client. Give them the exact work records required and ask them to find the reviewer for a manual-time request. Ask an operations lead to test who sees the relevant client report. Resolve unexplained visibility before the first real handoff.

Test the first mixed day. A shared designer may spend one hour helping the original team and three hours on the new account. Have them track both work references and approve a test correction. The account owners should each see the relevant reviewed total. The billing owner traces the total to the proper project, period and rate.

If two clients have different reporting dates or terms, keep both dates visible and prepare each account's handoff from its own approved records. Use the agency portfolio report guide for one customer's authorized projects, and the consulting team time guide to practice a correction between accounts.

Use the first client cycle as the rollout checklist

Second team rollout record
First deliverable and named owners:
Lead role, available time and the training plan:
Member and reviewer permissions:
Expected time, correction scenario and finance recipient:
Client update date and approved records:
Decision to expand, adjust or pause:

Run one small deliverable and ask another teammate to take the handoff. Agree how they will confirm the client's acceptance and what they will do if a correction is still pending. Book a Colabio demo to map a two-team pilot with your actual projects and approval roles.

Try it with your team

Colabio is free for individuals. Team plans are billed per seat and start with a free trial.

The Colabio team uses AI assistance to prepare guides. Worked examples use fictional data unless a source identifies them as real.