Figma time tracking for design agencies from draft to approval

Attach design time to the work item and the version the client reviewed. Give the design lead, client reviewer and billing owner a consistent record of the brief, revisions and final handoff.

By the Colabio teamPublished 4 min read

Key takeaways

  • Agree which design version and acceptance criteria each reviewed task covers.
  • Track design effort and requested revision work next to the reference and decision.
  • Use the approved versions and reviewed entries to prepare delivery and billing.

Review the plan and changes in one sample engagement

WorkPlanned or approved timeReviewed treatment
Create layout and responsive states12 hours planned14 hours recorded for the agreed design.
Included feedback round3 hours planned3 hours recorded on the agreed revision.
New account settings screen4 hours requestedUse its own scope estimate and approval, then track separately.
Fictional UI design engagement with one included review round

The original work planned for 15 hours used 17 after review. The new settings screen has four proposed hours outside that total. The delivery lead can explain the two-hour variance and confirm which version was accepted. Ask the account owner to decide the separate scope item using the scope change template.

Give the client contact the version link and the decision they own. Give finance the covered period, reviewed task time and pricing basis. A fixed-fee project uses the accepted scope and price, while the team still benefits from knowing how much design, feedback and handoff time it spent. Compare that time with the project estimate template for the next quote.

Track the review meetings in the same project if they belong to the agreed scope. Ask who was in the call and who confirmed the outcome, and tie the time entry to the version they saw. Keep any internal design comments in the appropriate workspace. Give the client the approved version and the specific decision they own.

If the client approves the new screen as four hours at an agreed $125 per hour and the reviewed time equals that estimate, the separate work adds $500 in this example. Show that task and its approval alongside the original engagement. If the screen is still pending, keep its estimate and expected date visible in the review.

Try a handoff to the person building the approved design. They should be able to identify the responsive states, locate the corresponding work item and check which revision the client approved. When a later version arrives, record when it became the accepted source and bring any new work into the next time review.

Hand over the design version with the reviewed time

Design version and time review
Client, project and design version link:
Included deliverables and accepted review round:
Time by design, feedback and handoff tasks:
Open change, estimate and decision owner:
Recipient access check and approved handoff date:
Next billing or delivery action:

Ask another designer to open the accepted version from the record and explain the status of the new settings screen. Check what the client can open on their account. Book a Colabio demo to try a version-linked task, time review and client update on your own fictional design engagement.

Try it with your team

Colabio is free for individuals. Team plans are billed per seat and start with a free trial.

The Colabio team uses AI assistance to prepare guides. Worked examples use fictional data unless a source identifies them as real.