How to hand over a TopTracker project when its owner leaves

If the person who owns a TopTracker client project is leaving, arrange the handover before their access changes. TopTracker says a project has one owner and ownership does not transfer to another user. Preserve the reports and invoice references an authorized reviewer needs, then start new tracked work in the successor project under the agreed owner. The example below shows how to keep already-invoiced hours out of the next draft.

By the Colabio teamPublished 4 min read

Key takeaways

  • Choose the new project owner and define when responsibility for new entries starts.
  • Keep the outgoing project export and invoice references available to the authorized reviewer.
  • Check billed, reviewed and held rows separately before building the new draft.

Have the outgoing owner leave a usable record

Read the project roles and owner changes in TopTracker's FAQ. It documents separate worker, supervisor and admin roles, with supervisors able to view activity but unable to access project invoices. The FAQ tells a successor to create a new project, and describes exporting old records as a file. Arrange access to the export and the issued invoice references while the current owner can still produce them.

In Reports, choose the current project, people and period, then export CSV as the vendor documents. Preserve the filters and the date basis with the file. Give the reviewer a restricted copy of the invoice numbers, covered periods and payment status separately. Use your existing approval procedure for sharing client records. Opening a new project in TopTracker does not move old entries or invoices into it.

If the outgoing owner handled payments, assign a named person to reconcile any unsettled invoices and payment requests using the original records. Confirm that the client has the right contact for questions. Keep the old invoice number even when its status is still open. An unpaid invoice is already issued, and including its hours in the successor draft can bill the client twice.

Reconcile a first draft across the two project owners

EntryTimeWhat the reviewer does
Old project, invoice C-104 already issued5 h 45 minLeave this on C-104 even if collection is still open.
Old project, approved time since C-1042 h 30 minCarry into this draft only after the outgoing owner confirms it was never invoiced.
Old project, scope under review3 hHold it with the reviewer and original entry references.
Successor project, approved new work4 h 15 minInclude once, with the successor project's work reference.
Fictional release support project handed over Wednesday at 17:00 UTC

If both approved rows have the same agreed $120 hourly rate, they add up to 6 hours 45 minutes, or $810 before any other invoice items. Keep the three held hours outside that sum. If the historical and new rates differ, calculate each line at its effective rate. Use the timesheet-to-invoice calculator to check the arithmetic against the example, and preserve separate references for the two projects.

The handover CSV contains these four fictional rows and a blank line for your own checks. It is an independent review sheet. Keep the vendor's original export unchanged, and use the worksheet to record which entries belong to which invoice and who checked them. Its columns do not describe the vendor's file format.

Ask a second reviewer to explain each omission. They should find C-104, see where the three held hours will be resolved and trace the 4 hours 15 minutes to the new project. Mark the first draft as ready after that check. Prefer a precise cutoff over month labels if contractors work across time zones.

Test one entry in the successor project

If you stay in TopTracker, verify that one worker can select the new project and that the intended owner can see the resulting report and invoice controls. If you move to Colabio, keep the TopTracker archive and test a newly created client project, a named task and a manager or project lead's review. Colabio has no TopTracker history importer. Read the roles and permissions guide before assigning access.

Keep prior approved billing in the handover worksheet or your accounting review. Colabio's client invoice workflow drafts from billable time in the selected Colabio projects. Confirm where the reviewer handles archive rows and how finance issues the combined invoice so each row is used once. For multiple client projects, book a demo to test the review handoff with the four fictional rows.

Try it with your team

Colabio is free for individuals. Team plans are billed per seat and start with a free trial.

The Colabio team uses AI assistance to prepare guides. Worked examples use fictional data unless a source identifies them as real.