Asana time tracking vs Harvest for teams already using Asana

Use native Asana time tracking when the team's main question is how long a task took against its estimate. Compare Asana's Timesheets and Budgets add-on or Harvest when someone must review time across projects and hand it to billing. Test each option with one project your team already understands.

By the Colabio teamPublished 4 min read

Key takeaways

  • Check the edition before using native Asana timers or weekly approval workflows.
  • Run an export with subtasks expanded and verify the time totals once.
  • If using Harvest in Asana, check the initial project and task mapping and which system owns the billing record.

Decide which time record the team needs

WorkflowWhat to testWhen it fits
Native Asana time trackingEstimate and actual time on a task, live timer, subtask rollup and project dashboard.Delivery wants to plan and review estimates in Asana.
Asana with Timesheets and BudgetsWeekly timesheet submission, reviewer, billable classification and CSV by date range.The team wants the time review inside Asana and can use the add-on.
Harvest with AsanaAsana task timer, Harvest project/task mapping and a Harvest invoice preview.Delivery works in Asana and finance needs Harvest's time and billing workflow.
Three workflows to check in the actual product

Asana's native time tracking guide describes Estimated time, Actual time and subtask rollups. It lists Advanced and Enterprise plans plus specified legacy tiers. Timesheet approvals and dated exports are documented separately for the Timesheets and Budgets add-on. Verify both entitlements in the account your team would use.

Harvest describes how to track time from an Asana task. It asks for a Harvest project and task the first time you track an Asana task. Its project import and sync goes from Asana to Harvest and excludes tasks. Pilot the mapping before onboarding the whole agency.

Run a twelve-hour pilot on real-shaped work

Create a fictional redesign with a parent task for the landing page and a review subtask. Plan ten hours in total across the task and subtask. Log seven hours on design, three on the subtask and two on internal handover. Decide that the design and review are billable at $110 an hour. The pilot now contains ten billable hours, two internal hours and a $1,100 time subtotal before taxes or expenses.

In Asana, view the task with its subtasks collapsed, then expand it. Confirm which number shows the parent record and which includes the child. Compare the 12-hour total to the rows in the export. If the export contains one rolled-up figure, use that figure once. If it contains individual entries, trace their task and date instead. Access to a detailed time-entry export can vary by feature availability.

Give a reviewer a second test. Move one hour from the internal handover to design after checking its task. With the stated rate the new time subtotal is $1,210 and total effort stays 12 hours. Confirm how each workflow shows the change to the reviewer, what the export contains and who is allowed to send the resulting amount to billing.

Have the project owner check how a late change appears in a saved report. If the first report contains the original amount, tag it with the period and the time it was saved. Produce a second version from the corrected source and verify that it still identifies the project. Give finance the version you expect it to use.

If you're testing Harvest, select only the verified billable time and check the invoice draft against the two totals. Harvest's time and materials invoicing guide explains the relationship among billable tasks, project rates and invoice lines. Check which Asana task reference your billing owner can still find.

Choose the system that owns reviewed time

Asana or Harvest pilot decision
Project and intended dates:
System used for estimates:
System used for the final time record:
Who maps tasks or reviews corrections:
Expected billable and internal totals:
Export or invoice location and owner:
Information missing at the handoff:

Pilot it with two different member roles. A contractor may have access to the redesign task but limited access to rates or internal work. Check that the person can see the assigned task and submit time, and that the right reviewer can explain a correction. Use the same expectations in each trial.

Close the pilot with someone who was not part of setup. Have them explain the 12-hour total, show the corrected amount and locate the underlying task. If you prefer to review project time, time-entry history and client invoices together, book a Colabio demo to run the same example with documented review roles. Bring a sample export and confirm which work links the team will use.