Identify the exact work the cap covers
Find the signed price or scope document and write down whether the cap is an amount or a number of hours. Record which project, tasks, rates and dates it covers. Clarify whether another role, expenses or tax sit outside it. Note the person authorized to approve extra work, and link any signed change order to the draft before relying on it.
Handle a wrong task, duplicate or missed stop through the ordinary time correction record. A cap can apply to a time entry that is entirely correct. Keep those actual hours in the delivery record and record the client adjustment separately. For a fuller pre-invoice review, use the billing evidence checklist.
Reconcile $1,460 of reviewed work to a $1,180 draft
In this fictional example a client covers up to 5.5 engineering hours at $160 per hour for a checkout redesign. A separate design item is hourly at $120 and lies outside the cap. Engineering records 7h 15m, design records 2h 30m, and the reviewer confirms each entry. No change order extends the engineering limit. All figures are in USD before tax and expenses.
| Line | Reviewed effort | Amount at rate | Included before tax |
|---|---|---|---|
| Engineering | 7h 15m | $1,160.00 | $1,160.00 |
| Design | 2h 30m | $300.00 | $300.00 |
| Approved engineering cap adjustment | No change to time records | −$280.00 | −$280.00 |
| Draft subtotal | 9h 45m | $1,460.00 before adjustment | $1,180.00 |
Engineering contributes $880 after the adjustment. That equals 5.5 × $160. If the client agreement calls for a capped quantity on the public invoice, show the 5.5 billable hours in that format and keep the $280 reconciliation internally. If the agreement applies a single hours cap across different rates, record the contractual allocation rule before doing the math.
A draft adjustment before issue is a different workflow from writing off an unpaid issued invoice. For an already issued invoice, follow your finance process for an adjustment or credit and link the original document. Use the post-invoice correction guide when an underlying time entry also needs correction.
Leave enough evidence for a second reviewer
Client, project, currency and invoice period:
Contract reference, cap and covered work:
Reviewed hours and original amounts by line:
Approved over-cap treatment or signed change:
Draft adjustment, explanation and reviewer:
Expected final subtotal and second reviewer:
Restricted supporting references retained internally:In Colabio client invoices, build a draft from the correct client, rates and period. Colabio supports added negative lines for discounts. If a separately labeled cap adjustment matches the way your agreement presents the charge, enter that approved amount as an added line, refresh if time or rates change, and compare the draft preview with your reconciliation before issuing. Keep team captures and internal review notes out of the client copy.
Use the full 9h 45m when reviewing how much delivery effort the engagement took. Close the loop with the project budget calculator or run this scenario in a Colabio demo with the person who owns client billing.
Recalculate the adjustment when the source changes
Suppose the reviewer removes a duplicated 15 minutes from engineering before issue. Engineering now stands at 7 hours, or $1,120, and the cap is still $880. After refreshing, replace the original $280 adjustment with $240. Leaving the old adjustment in place would bring the invoice total to $1,140 and silently underbill by $40. The corrected draft should still total $1,180 before tax.
If an authorized change order also raises the cap to 6.5 hours, use that new limit for the covered work and keep the approval reference with the draft. The engineering charge becomes $1,040 with an $80 adjustment. Design is still $300, so the new subtotal is $1,340. A second reviewer should be able to explain both changes without reopening the original timesheet exports to guess what happened.