Define the unbilled queue before counting days
Pick a review cutoff, a billing time zone and an age measure based on when the work happened. Use one row per agreed work or time reference. Keep hours, currency, services and contract type visible. Exclude issued invoice lines from the queue, even when the client has yet to pay. If the same work appears in an existing unissued draft, keep a single row and put that draft reference on it.
For this workflow, start with hourly work. Retainer time can consume an allowance without increasing the invoice, and fixed-fee effort serves a delivery or cost review. If your tool already provides an uninvoiced report, check how it defines the figures. Harvest’s documentation describes different calculations for hourly and fixed-fee projects.
Record whether the client agreement permits the charge, the time is reviewed and the rate is confirmed. If either the scope or time is disputed, mark the row Held and name the person who can settle it. If a goodwill adjustment or cap applies, keep the traceable amount on the individual draft. The hourly cap guide walks through that adjustment.
Sort $1,280 of recorded work into three decisions
The fictional agency reviews five USD entries, before tax and expenses. It flags each item older than 14 days as a review priority. The amounts reflect recorded effort at the agreed rate; holds still need a decision. Ages are stated as of the review cutoff.
| Reference | Age | Amount | State and next action |
|---|---|---|---|
| A-73 · design | 3 days | $300 | Ready. Billing adds it to this week’s draft. |
| B-20 · development | 17 days | $240 | Held. Account lead confirms the added scope with the client. |
| C-14 · QA | 9 days | $360 | Ready. Billing adds it to this week’s draft. |
| A-62 · design | 23 days | $300 | Held. Delivery lead reviews a possible duplicate before billing. |
| D-05 · support | 31 days | $80 | On draft. Billing owner checks the open draft before issue. |
The ready subtotal is $660. The held subtotal is $540, and the open draft contains $80. The queue ties to $1,280. The amount over 14 days is $620, of which $80 already sits on the open draft. Carry forward both held items with due dates. Use the time correction history for a possible duplicate, and the currency reconciliation guide if your next review includes more than one currency.
Reconcile next actions against the invoice draft
Cutoff date, billing time zone and currency:
Client, project, time reference, hours and original rate:
Service date, age and agreed charge:
Status, draft reference and reason for any hold:
Decision owner, deadline and evidence:
Ready, held and existing draft subtotals in the same currency:In Colabio client invoices, a draft groups billable time by member and project. Reconcile your review rows against the preview before issuing. If a draft line mixes a held entry with ready work, resolve the hold or leave the affected line out until the authorized owner can review it. Keep your aging sheet separately so reopening a draft cannot accidentally count the same work twice. Use a Colabio demo to run the five example records with your billing owner.
Carry forward the reason for each exception
Suppose the delivery lead confirms that 30 minutes of the disputed two-hour design entry were duplicated. At $150 per hour, the corrected 90 minutes are $225. Record the correction and keep the original service date. If the reviewer clears that entry for billing and nothing else changes, the ready subtotal becomes $885 and the held subtotal falls to $240. The corrected queue totals $1,205 before anything is issued.
At the next review, keep the reason for each movement. A row exits the queue when it is issued or the team decides it will never be billed. A held item can move to ready with its original date and named approval. That history lets the agency distinguish a slow review from a change in the recorded work.