How to review timesheet corrections without losing the history

A timesheet correction should answer three questions: what was recorded, what should replace it, and who decided. This checklist is for the person reviewing a requested change. It covers wrong tasks, forgotten timers, manual additions and the effect on billing, without treating a request as evidence that somebody did something wrong.

By the Colabio teamUpdated 4 min read

Key takeaways

  • Keep the original entry, the requested replacement, the reason and the review decision together.
  • Check duration and task assignment separately: moving time can change a client total without changing anybody's hours.
  • A question on an entry is a request for clarification, not an automatic deduction or a finding of misconduct.

Identify exactly what is changing

Begin with one person, a dated interval and a time zone. Record the original project, task and duration before examining the proposed change. A request that says only 'fix Tuesday' sends the reviewer back into detective work. Ask for the relevant interval and the intended correction instead of guessing.

Separate changes to duration from changes to assignment. Ending a forgotten timer earlier removes time. Moving an interval to the right client preserves the duration but changes the allocation. Splitting a block can do both. A manual addition fills work that was not recorded; it does not produce the same capture evidence as a running desktop timer.

If the issue is two intervals claiming the same minutes, use the overlapping time entries worksheet first. That guide reconciles the intervals. This one records the decision to approve, reject or clarify a particular correction.

Work through a wrong-client example

Consider this fictional review. A member recorded 09:00–11:00 against Client A's checkout task, then noticed that 10:15–11:00 was spent on Client B's accessibility review. The request keeps the first 75 minutes on A and moves the final 45 minutes to B. The member's total remains two hours; A loses 0.75 hours and B gains 0.75 hours.

RecordClient AClient BMember total
Before review2.00 hours0 hours2.00 hours
Proposed correction1.25 hours0.75 hours2.00 hours
Change−0.75 hours+0.75 hours0 hours
Fictional correction example. All intervals use the same date and time zone; no client rates are assumed.

The reviewer checks the task description and the member's explanation, asks about any uncertainty, and confirms which project should own the work. Billing status needs its own check: moving time to another project does not establish that the receiving client agreed to pay for it. Record that question separately if the scope or classification is unresolved.

Use a consistent review checklist

  1. Match the person, date, time zone and original entry. Check that the record has not changed since the request was written.
  2. Read the proposed start, end, project and task. Recalculate the duration and any split rather than relying on a summary label.
  3. Read the reason and any relevant work context. Ask a neutral question when the explanation is incomplete; a low activity figure does not settle what happened.
  4. Check whether the replacement overlaps other entries or moves time outside the agreed reporting period.
  5. Check billable status, the affected client or project, and any invoice already drafted from that period.
  6. Have an authorized reviewer decide, record the reason, and confirm the resulting sheet. Keep unresolved questions visible instead of approving them by omission.

Review enough supporting information to decide the specific request. A correction about a client assignment may need a task link and a sentence of context, rather than a broad inspection of the person's day. When records are missing, say what is missing and ask the member; absence of a capture is not a substitute for an explanation.

Keep a short decision record

Timesheet correction review record
Member / date / time zone:
Original entry and project:
Requested replacement or split:
Reason supplied by the member:
Duration before / duration after:
Projects or client totals affected:
Billing status or invoice needing another check:
Clarification requested, if any:
Reviewer / decision / date:
Reason for the decision:
Follow-up owner and due date:

Write a reason that another reviewer can understand next month. 'Approved: final 45 minutes belong to the accessibility task discussed in the update' is more useful than 'fixed.' If the request is rejected, explain what did not match and how the member can supply the missing information. Keep a pending request distinct from a rejected one.

Check the downstream record before closing

After applying the correction, compare the resulting day and the affected project totals with the approved proposal. If somebody already exported the old sheet, identify the replacement version so both copies do not circulate as final. Refresh a draft invoice that relied on changed time and review its lines again. An issued invoice needs the product's documented correction process rather than an assumption that it changed automatically.

Try the interactive client invoice example to see an accepted correction change the timesheet first and the invoice total after a draft refresh.

In Colabio, members who cannot edit request a correction, and an authorized reviewer approves or rejects it. Entry history keeps the before and after, actor and reason; adjusted entries are marked. Review flags ask questions without changing time. The corrections and history guide explains the controls, while client invoices explains draft refresh and issued invoice behavior. Use the timesheet audit export checklist to reconcile an existing report after approved changes.

Try it with your team

Colabio is free for individuals. Team plans are billed per seat and start with a free trial.

The Colabio team uses AI assistance to prepare guides. Worked examples use fictional data unless a source identifies them as real.